Scheduled Power Shutdown Theses Areas in Jammu and Kashmir from March 9-12

JAMMU: The Chief Engineer (Distribution), JPDCL Jammu, has informed that the power supply to Barui, Nardiwal, Mandrian, Kha, Maira, Thatar Mundh, Payan, and adjoining areas will remain affected on March 09 and 11 from 8 am to 2 pm.

WhatsApp Group Join Now

JKPSC Interview notice for the post of Horticulture Development

Similarly, the power supply to Kartholi and adjoining areas will remain affected on March 09 from 9 am to 2 pm.

Likewise, the power supply to Bishnah, RS Pura, the industrial area of Bari Brahmana, Vijaypur, Nandpur, Ramgarh, and adjoining areas will remain affected on March 09 from 10 am to 1 pm. The shutdown has been approved by JKSLDC and Railway Authorities.

Similarly, the power supply to Billawar, Mandi, Dewal, Pranalla, Tandi, Macheedi, Bhaddu, Kudethar, and adjoining areas will remain affected on March 10 and 12 from 9 am to 4 pm.

Likewise, the power supply to the Bari Brahmana Industrial Area will remain affected on March 09 from 9 am to 1 pm.

Similarly, the power supply to Nichla Ghagwal, Sherpur, Rajpura, Jatwal, Kootah, Mawa, and adjoining areas will remain affected on March 09 from 10 am to 1 pm.

Meanwhile, the Superintending Engineer (Distribution), JPDCL O&M Circle Kathua, has informed that the power supply to Bari Brahmana, Teli Basti, Kartholi, and adjoining areas will remain affected on March 10 and 12 from 10 am to 4 pm.

Similarly, the power supply to Shiva Nagar, Chak, Changran, Manke Talab, and adjoining areas will remain affected on March 09 from 8 am to 12 noon.

Leave a Comment